News
LATEST NEWS
- 01Application of ceramic plunger pump
- 02The structure and principle of ceramic pumps
- 03Alumina ceramic properties
- 04Ceramic metering pump manufacturer
- 05Chinese ceramic pump manufacturer
- 06Troubleshooting pneumatic valve actuators
- 07Analysis of Speed Control Valve Faults in Hydraulic Station Hydraulic Systems
- 08What are the requirements and methods for pressure testing of imported valves?
- 09How to correctly choose a suitable imported valve
- 010Precautions for the Installation and Maintenance of Safety Valves

Address:1st Floor, Zixiang Road, Pingshan District, Shenzhen, Guangdong Province
Zip Code: 518100
Phone: +86 13410681808
E-mail:juchang@ceramic-pumps.com
News
HOMENews
Precautions for the Installation and Maintenance of Safety Valves
2026-03-07 15:41:16 View:92Precautions for the Installation and Maintenance of Safety Valves:
(1) Newly installed safety valves must be accompanied by a product certificate. Before installatiomust undergo re-calibration, be lead-sealed, and a safety valve calibration certificate must be issued.
(2) Safety valves should be installed vertically and positioned at the gas-phase rface of the vessel or pipeline.
(3) The outlet of the safety valve must be free of resistance to avoid backpressure. If a discharge pipe is installed, its inner diamst be larger than the outlet diameter of the safety valve. The safety valve discharge outlet should be protected against freezing. For vessels containing flammable or toxic, highly toxic media, the discharpe must lead directly to a safe outdoor location or to facilities for proper treatment; no valves are allowed to be installed on the discharge pipe of self-acting con





